ICSE Board Practice

ICSE Grade VIII - Unitary Method
Question 1
1.
The cost of 10 kg of carrots is ₹290. How much has to be paid to purchase 15 kg of carrots ?
  • ₹450
  • ₹435
  • ₹461
  • ₹423
  • ₹407
Question 2
2.
In an eating contest, the eating capacities of A, B and C are 8 gm/sec, 15 gm/sec and 11 gm/sec respectively. If the amount of food to be eaten is 12.24 kg, in how much time is it consumed if all three participants start eating together ?
  • 8
    min
  • 4
    min
  • 6
    min
  • 5
    min
  • 7
    min
Question 3
3.
To irrigate 14 acres of a field, 90000 l of water is needed. If 5 more acres are brought under cultivation, how many lts of water is needed?
  • 147142.86 l
  • 138142.86 l
  • 122142.86 l
  • 119142.86 l
  • 104142.86 l
Question 4
4.
A vehicle can cover certain distance in 140 min, running at a speed of 108 kmph. At what speed must the vehicle run to cover the same distance in 120 min?
  • 126 kmph
  • 100 kmph
  • 119 kmph
  • 139 kmph
  • 128 kmph
Question 5
5.
The cost of 10 dozen bananas is ₹430. What is the cost of 15 dozens ?
  • ₹627
  • ₹659
  • ₹642
  • ₹645
  • ₹673
Question 6
6.
A bus ticket fare for 19 km costs ₹72. How much is the fare for 12 km?
  • ₹45.47
  • ₹50.47
  • ₹48.47
  • ₹40.47
  • ₹42.47
Question 7
7.
18 m of cloth is required to stitch 5 dresses. How many meters of cloth is required to stitch 19 dresses?
  • 71.40 m
  • 65.40 m
  • 73.40 m
  • 68.40 m
  • 63.40 m
Question 8
8.
14 gm of gold costs ₹39200. What is the cost of 29 gm ?
  • ₹79600
  • ₹81200
  • ₹79000
  • ₹82700
  • ₹81800
Question 9
9.
    • The slab rates of a city's water department are as follows
    • Low Val (kl)
      -
      High Val (kl)
      Rate Rs/kl
      0
      -
      30
      10
      30
      -
      40
      15
      40
      -
      50
      20
      50
      -
      remaining
      25
    • How much amount has to be paid if the consumption is
    • 79 kl
    • .
  • ₹1445
  • ₹1655
  • ₹1215
  • ₹1335
  • ₹1375
Question 10
10.
60 men can dig a canal in 91 days  working for 9 hr per day. How many men are required to complete the work in 108 days  working for 13 hr per day?
  • 37
  • 33
  • 35
  • 34
  • 36